Roof structure in place

The pre-cast concrete planks have arrived at Bigbury Hollow and are slotting into place to create the base for the underground roof areas. These will be insulated and a waterproof membrane will be applied prior to a reinforced waterproof concrete layer being poured. Then another finished membrane on top of which soil will be replaced and plants will grow.